Johannesburg, 17 February 2023: Sibanye-Stillwater (Tickers JSE: SSW and NYSE: SBSW - https://www.commodity-tv.com/ondemand/companies/profil/sibanye-stillwater-ltd/ ) is pleased to report attributable Group Mineral Resources and Mineral Reserves as at 31 December 2022.

 

The declared Mineral Resources and Mineral Reserves for the Group's managed operations and projects are the outcome of a detailed annual operational and life of mine (LoM) planning process and are indicative of the considerable underlying mineral assets base which supports sustainable long-life production.

 

The Group has established a diversified portfolio of  assets across five continents, with substantial Mineral Resources underpinning long life production of a diverse mix of metals and minerals - which reduces risk and supports its strategy of producing green metals and future energy solutions.

 

This Mineral Resource and Mineral Reserve declaration represents a condensed and consolidated summary of the full Sibanye-Stillwater Mineral Resource and Mineral Reserve declaration which will be available in the Group Mineral Resource and Mineral Reserve Report, when published on 24 April 2023 at www.sibanyestillwater.com/news-investors/reports/annual/.

 

Salient features

 

-          A maiden lithium (Li) Mineral Reserve of 193.6kt of Lithium Carbonate Equivalent (LCE), and a 133% increase in Li Mineral Resources to 452.9kt of LCE

      Continuous execution and delivery on the Group’s green metals strategy with an increased focus on battery metals, has led to an increase in attributable ownership of the Keliber project in Finland from 26.6% to 84.96%

      The declaration of Mineral Reserves follows the completion of a positive Feasibility Study (FS) and the approval for the construction of the Keliber project

      Ongoing, successful exploration at the large and prospective mineral tenement holdings at Keliber also contributed an additional 30.4kt of attributable LCE Mineral Resource

-          2E PGM Mineral Reserves of 26.3Moz and Mineral Resources of 84.2Moz following the repositioning of our US PGM operations and consequent update of the life of mine (LoM) plans

      The Mineral Reserves supports a 42 year LoM, building up to 700koz of annual production by 2026

      The estimates reflects minor year-on-year decreases of 3.6% and 6.1% respectively, due to enhanced t in estimation methodologies, with considerable Mineral Reserve upside potential remaining, based on the very large Inferred Resource base of 44.8Moz

-          31.4Moz 4E PGM Mineral Reserves at our SA PGM operations,  and a 1.5% increase in Mineral Resources to 177.3Moz

      The 2.3% decrease in Mineral Reserves was principally driven by depletion of 2.7Moz during 2022, partly off-set by the conclusion of a positive FS at the 50% owned Mimosa North Hill project (+1.5Moz), which is currently under board consideration for construction

      The large 4E PGM Mineral Resources base at the SA PGM operations provide significant opportunity  to increase future Mineral Reserves, extending the life of the operations and unlocking substantial value, subject to the necessary studies being completed and a supportive investment environment

-          Stable Mineral Reserves of 12.9Moz (-0.6%), and Mineral Resources of 69.3Moz (-7.2%) at our SA gold operations and projects (including DRDGOLD)

 

2.Group overview

 

Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

PGM

 

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Americas¹

Operations

Measured

42.6

13.7

18.7

18.7

39.9

14.7

18.9

18.9

 

 

Indicated

50.4

12.8

20.7

20.7

59.1

13.8

26.1

26.1

 

 

Measured + Indicated

93.0

13.2

39.4

39.4

99.0

14.1

45.0

45.0

 

 

Inferred

114.0

12.2

44.8

44.8

113.6

12.2

44.6

44.6

 

Exploration

Measured

18.8

0.8

0.5

2.8

23.5

0.9

0.7

2.8

 

 

Indicated

21.5

0.6

0.4

2.3

27.8

0.7

0.6

2.4

 

 

Measured + Indicated

40.3

0.7

0.9

5.1

51.3

0.8

1.3

5.2

 

 

Inferred

5.0

0.5

0.1

0.4

7.5

0.9

0.2

0.6

Southern Africa²

Operations

Measured

419.7

4.3

58.2

81.8

440.4

4.2

59.7

83.7

 

 

Indicated

644.1

4.3

89.3

113.7

624.4

4.3

85.8

110.0

 

 

Measured + Indicated

1,063.7

4.3

147.6

195.5

1,064.8

4.2

145.4

193.7

 

 

Inferred

212.3

4.4

29.7

38.5

209.6

4.3

29.3

38.1

 

Exploration

Measured

1.8

4.2

0.2

0.3

1.8

4.2

0.2

0.3

 

 

Indicated

253.7

4.1

33.5

47.0

247.3

4.2

33.3

46.6

 

 

Measured + Indicated

255.4

4.1

33.7

47.3

249.0

4.2

33.5

46.9

 

 

Inferred

165.4

3.7

19.4

27.5

162.4

3.7

19.4

27.3

Total Measured + Indicated

1,452.4

4.7

221.5

287.3

1,464.1

4.8

225.2

290.9

Grand total

 

 

1,949.1

5.0

315.6

398.5

1,957.2

5.1

318.7

401.5

 

GOLD

 

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Americas

Exploration

Measured

 656.7 

 0.1 

 2.5 

 2.6 

 661.4 

 0.1 

 2.5 

 2.7 

 

 

Indicated

 614.2 

 0.1 

 1.7 

 2.5 

 622.2 

 0.1 

 1.7 

 2.6 

 

 

Measured + Indicated

 1,270.9 

 0.1 

 4.1 

 5.2 

 1,283.6 

 0.1 

 4.2 

 5.2 

 

 

Inferred

 202.7 

 0.1 

 0.5 

 0.8 

 206.1 

 0.1 

 0.5 

 0.8 

Southern Africa

Operations

Measured

 483.5 

 1.8 

 28.5 

 31.4 

 496.6 

 1.8 

 29.3 

 32.3 

 

 

Indicated

 401.8 

 1.4 

 18.2 

 20.6 

 409.2 

 1.4 

 18.4 

 20.8 

 

 

Measured + Indicated

 885.3 

 1.6 

 46.7 

 51.9 

 905.9 

 1.6 

 47.7 

 53.1 

 

 

Inferred

 35.4 

 5.8 

 6.6 

 6.7 

 41.3 

 8.2 

 10.9 

 11.0 

 

Development

Measured

 1.1 

 6.2 

 0.2 

 0.2 

 1.1 

 6.2 

 0.2 

 0.2 

 

 

Indicated

 25.5 

 5.6 

 4.6 

 4.6 

 25.5 

 5.6 

 4.6 

 4.6 

 

 

Measured + Indicated

 26.6 

 5.7 

 4.8 

 4.8 

 26.6 

 5.7 

 4.8 

 4.8 

 

 

Inferred

 31.5 

 4.2 

 4.3 

 4.3 

 31.5 

 4.2 

 4.3 

 4.3 

 

Exploration

Measured

  

  

  

  

  

  

  

  

 

 

Indicated

 44.1 

 4.5 

 6.4 

 6.4 

 44.1 

 4.5 

 6.4 

 6.4 

 

 

Measured + Indicated

 44.1 

 4.5 

 6.4 

 6.4 

 44.1 

 4.5 

 6.4 

 6.4 

 

 

Inferred

 4.0 

 3.6 

 0.5 

 0.5 

 4.0 

 3.6 

 0.5 

 0.5 

Total Measured + Indicated

 2,226.9 

 0.9 

 62.1 

 68.4 

 2,260.2 

 0.9 

 63.2 

 69.6 

Grand total

 

 

 2,500.5 

 0.9 

 73.9 

 80.6 

 2,543.1 

 1.0 

 79.3 

 86.1 

 

LITHIUM

 

 

Tonnes

Li

LCE

LCE 100%

Tonnes

Li

LCE

LCE 100%

 

 

 

(Mt)

(%)

(kt)

(kt)

(Mt)

(%)

(kt)

(kt)

Europe³

Development

Measured

 3.7 

 0.5 

 106.4 

 125.3 

 1.1 

 0.5 

 33.3 

 125.3 

 

 

Indicated

 8.0 

 0.5 

 202.4 

 238.3 

 2.4 

 0.5 

 62.0 

 232.9 

 

 

Measured + Indicated

 11.6 

 0.5 

 308.9 

 363.5 

 3.6 

 0.5 

 95.3 

 358.2 

 

 

Inferred

 2.8 

 0.4 

 57.2 

 67.4 

 0.4 

 0.4 

 9.8 

 36.9 

Americas³

Exploration

Measured

 2.7 

 0.2 

 24.8 

 356.8 

 2.8 

 0.2 

 25.4 

 356.8 

 

 

Indicated

 6.1 

 0.2 

 50.4 

 725.2 

 6.3 

 0.2 

 51.6 

 725.2 

 

 

Measured + Indicated

 8.8 

 0.2 

 75.2 

 1,082.0 

 9.0 

 0.2 

 77.0 

 1,082.0 

 

 

Inferred

 1.4 

 0.2 

 11.6 

 166.8 

 1.4 

 0.2 

 11.9 

 166.8 

Total Measured + Indicated

 20.4 

 0.4 

 384.1 

 1,445.5 

 12.6 

 0.3 

 172.3 

 1,440.2 

Grand total

 

 

 24.6 

 0.3 

 452.9 

 1,679.7 

 14.4 

 0.3 

 194.0 

 1,643.9 

 

URANIUM

 

 

Tonnes

Grade

U₃O₈

U₃O₈ 100%

Tonnes

Grade

U₃O₈

U₃O₈ 100%

 

 

 

(Mt)

 (kg/t)

 (Mlb)

 (Mlb)

(Mt)

 (kg/t)

 (Mlb)

 (Mlb)

Southern Africa

Exploration

Measured

 158.0 

 0.1 

 40.4 

 50.5 

 159.5 

 0.1 

 40.5 

 50.6 

 

 

Indicated

 49.1 

 0.2 

 26.1 

 28.5 

 47.5 

 0.2 

 25.9 

 28.3 

 

 

Measured + Indicated

 207.0 

 0.1 

 66.5 

 79.0 

 207.0 

 0.1 

 66.4 

 78.8 

 

 

Inferred

  

 1.1 

 0.1 

 0.1 

  

 1.1 

 0.1 

 0.1 

Grand total

 

 

 207.1 

 0.1 

 66.6 

 79.1 

 207.1 

 0.1 

 66.5 

 78.9 

 

COPPER

 

 

Tonnes

Grade

Copper

Copper 100%

Tonnes

Grade

Copper

Copper 100%

 

 

 

(Mt)

(%)

(Mlb)

(Mlb)

(Mt)

(%)

(Mlb)

(Mlb)

Americas

Exploration

Measured

 656.7 

 0.4 

 6,179.2 

 6,558.0 

 661.4 

 0.4 

 6,200.9 

 6,559.5 

 

 

Indicated

 614.2 

 0.4 

 5,477.1 

 6,320.5 

 622.2 

 0.4 

 5,544.1 

 6,368.7 

 

 

Measured + Indicated

 1,270.9 

 0.4 

 11,656.3 

 12,878.5 

 1,283.6 

 0.4 

 11,745.0 

 12,928.2 

 

 

Inferred

 202.7 

 0.4 

 1,812.1 

 2,098.4 

 206.1 

 0.4 

 1,856.9 

 2,150.3 

Grand total

 

 

 1,473.6 

 0.4 

 13,468.4 

 14,976.9 

 1,489.7 

 0.4 

 13,601.8 

 15,078.5 

 

ZINC

 

 

Tonnes

Grade

Zinc

Zinc 100%

Tonnes

Grade

Zinc

Zinc 100%

 

 

 

(Mt)

(%)

(Mlb)

(Mlb)

(Mt)

(%)

(Mlb)

(Mlb)

Australia

Operations

Measured

 7.3 

 3.1 

 490.7 

 2,467.0 

 10.6 

 3.0 

 706.9 

 3,536.2 

 

 

Indicated

  

  

  

  

  

  

  

  

 

 

Measured + Indicated

 7.3 

 3.1 

 490.7 

 2,467.0 

 10.6 

 3.0 

 706.9 

 3,536.2 

 

 

Inferred

  

  

  

  

  

  

  

  

 

Exploration

Measured

 0.2 

 4.8 

 21.0 

 105.8 

 0.2 

 4.8 

 21.2 

 105.8 

 

 

Indicated

 1.8 

 5.7 

 221.0 

 1,111.1 

 1.8 

 5.7 

 222.1 

 1,111.1 

 

 

Measured + Indicated

 2.0 

 5.6 

 242.1 

 1,217.0 

 2.0 

 5.6 

 243.3 

 1,217.0 

 

 

Inferred

 0.5 

 6.5 

 65.8 

 330.7 

 0.5 

 6.5 

 66.1 

 330.7 

Total Measured + Indicated

 9.2 

 1.5 

 732.7 

 3,683.9 

 12.6 

 1.4 

 950.2 

 4,753.2 

Grand total

 

 

 9.7 

 1.5 

 798.5 

 4,014.6 

 13.0 

 1.5 

 1,016.3 

 5,083.9 

Note: Mineral Resources are attributable, and metal content is additionally stated on a 100% basis

1For the US PGM operations, PGM is represented by the 2E (Pt and Pd)

2For the SA PGM operations, PGM is represented by the 4E (Pt, Pd, Rh and Au)

3For the Lithium Mineral Resources, LCE content was calculated by multiplying the Li (%) content by a factor of 5.323. Lithium Hydroxide Monohydrate (LiOH.H2O)) can be derived from LCE by dividing by a factor of 0.88

 

Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

PGM

 

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Americas¹

Operation

Proved

 10.0 

 13.5 

 4.3 

 4.3 

 8.2 

 15.4 

 4.1 

 4.1 

 

 

Probable

 50.3 

 13.6 

 22.0 

 22.0 

 60.1 

 12.0 

 23.2 

 23.2 

 

 

Proved + Probable

 60.2 

 13.6 

 26.3 

 26.3 

 68.3 

 12.4 

 27.3 

 27.3 

Southern Africa²

Operation

Proved

 128.9 

 3.5 

 14.7 

 21.4 

 124.6 

 3.5 

 14.2 

 20.0 

 

 

Probable

 151.2 

 3.4 

 16.7 

 21.6 

 171.0 

 3.3 

 18.0 

 23.1 

 

 

Proved + Probable

 280.0 

 3.5 

 31.4 

 43.0 

 295.6 

 3.4 

 32.2 

 43.2 

Grand total Proved + Probable

 340.3 

 5.3 

 57.7 

 69.3 

 363.9 

 5.1 

 59.4 

 70.5 

 

GOLD

 

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Southern Africa

Operation

Proved

 227.8 

 0.9 

 6.6 

 8.7 

 149.6 

 1.4 

 6.8 

 8.0 

 

 

Probable

 124.6 

 0.9 

 3.7 

 4.5 

 154.8 

 0.7 

 3.7 

 5.0 

 

 

Proved + Probable

 352.4 

 0.9 

 10.3 

 13.2 

 304.4 

 1.1 

 10.4 

 13.0 

 

Development

Proved

  

  

  

  

  

  

  

  

 

 

Probable

 20.5 

 4.0 

 2.7 

 2.7 

 20.6 

 3.9 

 2.6 

 2.6 

 

 

Proved + Probable

 20.5 

 4.0 

 2.7 

 2.7 

 20.6 

 3.9 

 2.6 

 2.6 

Grand total Proved + Probable

 373.0 

 1.1 

 12.9 

 15.9 

 325.0 

 1.2 

 13.0 

 15.6 

 

LITHIUM

 

 

Tonnes

Li

LCE

LCE 100%

Tonnes

Li

LCE

LCE 100%

 

 

 

(Mt)

(%)

(kt)

(kt)

(Mt)

(%)

(kt)

(kt)

Europe³

Development

Proved

 3.3 

 0.5 

 85.4 

 100.5 

  

  

  

  

 

 

Probable

 4.9 

 0.4 

 108.2 

 127.3 

  

  

  

  

Grand total Proved + Probable

 8.2 

 0.4 

 193.6 

 227.9 

  

  

  

  

 

ZINC

 

 

Tonnes

Grade

Zinc

Zinc 100%

Tonnes

Grade

Zinc

Zinc 100%

 

 

 

(Mt)

(%)

(Mlb)

(Mlb)

(Mt)

(%)

(Mlb)

(Mlb)

Australia

Operation

Proved

 6.8 

 3.0 

 445.5 

 2,239.9 

 9.9 

 3.0 

 649.2 

 3,247.4 

 

 

Probable

  

  

  

  

  

  

  

  

Grand total Proved + Probable

 6.8 

 3.0 

 445.5 

 2,239.9 

 9.9 

 3.0 

 649.2 

 3,247.4 

Note: Mineral Reserves are attributable, and metal content is additionally stated on a 100% basis

1For the US PGM operations, PGM is represented by the 2E (Pt and Pd)

2For the SA PGM operations, PGM is represented by the 4E (Pt, Pd, Rh and Au)

3For the Lithium Mineral Resources, LCE content was calculated by multiplying the Li (%) content by a factor of 5.323. Lithium Hydroxide Monohydrate (LiOH.H2O)) can be derived from LCE by dividing by a factor of 0.88

 

 

2.1. About our disclosure and related assumptions

 

The Group reports in accordance with both the JSE and the US Securities and Exchange Commission (SEC) rules and guidelines on commodity prices used for the estimation of Mineral Resources and Mineral Reserves at all managed operations, development, and exploration properties. This specific disclosure is in compliance with the JSE rules, while the SEC compliant version can be located at https://www.sibanyestillwater.com/download/reserves-resources-dec2022-nyse

 

We use forward looking prices, based on extensive market research, that reflect “through the cycle” pricing. Mineral Resource price assumptions, which focus on longer timeframes, are based on moderately higher prices than for Mineral Reserves to reflect the ore-body flexibility.

 

The US$ based, forward looking commodity prices used for the 2022 LoM process has largely been retained from 2021, with only minor changes. The Mineral Reserve gold price has been adjusted marginally downwards by US$9 (-0.5%), whilst the uranium price has been adjusted upwards to reflect the growing recognition of the role nuclear power will play in securing baseload, low carbon, green energy supply.

 

The commodity prices used in the estimation of Mineral Resources and Mineral Reserves at the non-managed entities are provided in the notes to the relevant tables. In specific reference to Keliber, which became majority owned and managed by Sibanye-Stillwater during the course of 2022, the estimates reflect work done by the Keliber Competent Persons (QP's) prior to the company taking majority ownership and were conducted at a Li price of ~US$25,000/t LiOH.H2O much more conservative than the current consensus long-term market outlook price of  ~US$37,000/t LiOH.H2O.

 

The exchange rate used for the Mineral Resources and Mineral Reserves Declaration as at 31 December 2022 is R16.00/US$, up from R15.00/US$ at end 2021, reflecting the deteriorating long-term ZAR outlook.

 

The Mineral Reserve basket prices used in the determination of all the commodities estimates represents significant discounts to the current (16 Feb 2023) metal spot prices, reflecting the significant operating margins at our operations.

2E PGM:  US$1,250 vs spot of US$1,355, a premium of  8% 4E PGM:  ZAR31,281 vs spot of ZAR38,643, a premium of 23% Gold:   ZAR850,000/kg vs spot of ~ZAR1,064,500/kg, a premium of 25%

 

Sibanye-Stillwater 2022 price decks for Mineral Resources & Mineral Reserves at managed operations.

 

31-Dec-22

31-Dec-21

 

MINERAL RESOURCES

MINERAL RESERVES

MINERAL RESERVES

Precious metals

US$/oz

R/oz

R/kg

US$/oz

R/oz

R/kg

US$/oz

R/oz

R/kg

Gold

1,800

28,800

925,941

1,650

26,400

850,000

1,659

24,885

800,000

Platinum

1,500

24,000

771,617

1,250

20,000

643,014

1,250

18,750

602,826

Palladium

1,500

24,000

771,617

1,250

20,000

643,014

1,250

18,750

602,826

Rhodium

10,000

160,000

5,144,116

8,000

128,000

4,115,292

8,000

120,000

3,858,084

Iridium

3,000

48,000

1,543,235

2,500

40,000

1,286,029

2,500

37,500

1,205,651

Ruthenium

350

5,600

180,044

300

4,800

154,323

300

4,500

144,678

Base metals

US$/lb

US$/tonne

R/tonne

US$/lb

US$/tonne

R/tonne

US$/lb

US$/tonne

R/tonne

Nickel

7.94

17,500

280,000

7.35

16,200

259,200

7.35

16,200

243,000

Copper

4.54

10,000

160,000

4.06

8,950

143,200

4.06

8,950

134,250

Cobalt

25

55,116

881,848

22

48,502

776,026

22

48,502

727,525

Uranium oxide (U3O8) 1

55

121,254

1,940,066

50

110,231

1,763,696

40

88,185

1,322,772

Chromium oxide (Cr2O3),(42% concentrate) 1

0

165

2,640

0

150

2,400

0.07

150

2,250

1 Long term contract prices

 

The relevant metal (prill) split exposure of our PGM operations is summarised below.

 

Prill Splits

2E Prill split (US PGM operations)

Unit

Stillwater Mine

East Boulder Mine

Average

Platinum

%

22.2

21.7

22.0

Palladium

%

77.8

78.3

78.0

 

4E Prill split (SA PGM operations)

Unit

Marikana

Rustenburg

Kroondal

Mimosa

MER

UG2

MER

UG2

UG2

MSZ

Platinum

%

61.8

59.4

63.7

54.0

58.1

49.4

Palladium

%

27.8

28.9

27.3

34.0

31.1

38.2

Rhodium

%

3.3

11.2

4.0

11.2

10.1

4.0

Gold

%

7.1

0.6

4.9

0.8

0.7

8.4

MER – Merensky Reef

UG2 – Upper Group 2 Chromitite

MSZ – Main Sulphide Zone

 

Group Mineral Resources and Mineral Reserves per geographical region & commodity

 

3.1. Americas

 

3.1.1. Platinum group metals

 

3.1.1.1. Montana operations

 

-          Total 2E PGM Mineral Resources of 84.2Moz, a year-on-year decrease of 6.1%

-          Total 2E PGM Mineral Reserves of 26.3Moz, a year-on-year decrease of 3.6%

 

PGM Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

PGM

Americas

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Operations

Stillwater and

Measured

 42.6 

 13.7 

 18.7 

 18.7 

 39.9 

 14.7 

 18.9 

 18.9 

 

East Boulder

Indicated

 50.4 

 12.8 

 20.7 

 20.7 

 59.1 

 13.8 

 26.1 

 26.1 

 

 

Measured + Indicated

 93.0 

 13.2 

 39.4 

 39.4 

 99.0 

 14.1 

 45.0 

 45.0 

 

 

Inferred

 114.0 

 12.2 

 44.8 

 44.8 

 113.6 

 12.2 

 44.6 

 44.6 

Grand total

 

 

 207.0 

 12.6 

 84.2 

 84.2 

 212.6 

 13.1 

 89.6 

 89.6 

 

PGM Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

PGM

Americas

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Operations

Stillwater and

Proved

 10.0 

 13.5 

 4.3 

 4.3 

 8.2 

 15.4 

 4.1 

 4.1 

 

East Boulder

Probable

 50.3 

 13.6 

 22.0 

 22.0 

 60.1 

 12.0 

 23.2 

 23.2 

Grand total Proved + Probable

 60.2 

 13.6 

 26.3 

 26.3 

 68.3 

 12.4 

 27.3 

 27.3 

2E PGM = Pt (78%) + Pd (22%)

 

During 2022, a comprehensive update of the Mineral Resource and Mineral Reserve estimation methodology at the Montana operations was undertaken, which also included an update to the mine plan and scheduling. This repositioning of the US PGM operations culminated in a revision to the Mineral Reserves which now supports a 42 year LoM, building up to +700koz of annual production from 2027.

 

A detailed reconciliation of the 2021 to 2022 US PGM operations Mineral Reserves is shown in the following table.

 

US PGM operations – Mineral Reserves reconciliation

Factors

2E PGM (Moz)

31-Dec-21

27.3

Depletion

-0.5

Post depletion

26.8

Area Inclusions/Exclusions

0.4

Geological interpretation

-3.9

Estimation methodology

2.5

Modifying factors

0.5

31-Dec-22

26.3

 

3.1.1.2. US PGM exploration projects

 

PGM Mineral Resources

 

 

31 Dec 2022

31 Dec 2021

PGM

Americas

Tonnes

PGM

PGM

Copper

Copper

Tonnes

PGM

PGM

Copper

Copper

Exploration

 

(Mt)

(g/t)

(Moz)

(%)

(Mlb)

(Mt)

(g/t)

(Moz)

(%)

(Mlb)

Marathon¹

Measured

 18.8 

 0.8 

 0.5 

 0.2 

 84.2 

 23.4 

 0.8 

 0.6 

 0.2 

 104.9 

 

Indicated

 21.5 

 0.6 

 0.4 

 0.2 

 101.7 

 26.7 

 0.6 

 0.5 

 0.2 

 126.6 

 

Measured + Indicated

 40.3 

 0.7 

 0.9 

 0.2 

 185.9 

 50.1 

 0.7 

 1.1 

 0.2 

 231.5 

 

Inferred

 5.0 

 0.5 

 0.1 

 0.2 

 25.5 

 6.2 

 0.5 

 0.1 

 0.2 

 31.7 

Denison²

Measured

  

  

  

  

  

 0.1 

 6.2 

  

 0.5 

 1.0 

 

Indicated

  

  

  

  

  

 1.1 

 2.8 

 0.1 

 1.3 

 31.3 

 

Measured + Indicated

  

  

  

  

  

 1.2 

 3.0 

 0.1 

 1.2 

 32.3 

 

Inferred

  

  

  

  

  

 1.3 

 2.7 

 0.1 

 1.2 

 33.7 

Total Measured + Indicated

 40.3 

 0.7 

 0.9 

 0.2 

 185.9 

 51.3 

 0.8 

 1.3 

 0.2 

 263.7 

Grand total

 

 45.3 

 0.7 

 1.0 

 0.2 

 211.4 

 58.8 

 0.8 

 1.5 

 0.3 

 329.1 

118.19% Attributable, non-managed

264.92% Attributable, non-managed

 

-          In January 2022 the Group reached an agreement with Generation Mining Ltd. to dispose of its 16.5% direct project level interest in the Marathon project, held via Stillwater Canada Inc., a subsidiary of Sibanye-Stillwater Limited, in exchange for 21,759,332 common shares in Generation Mining, bringing the Groups' share holding in Generation Mining to 18.19%. This has resulted in an associated 4.46% decrease in attributable Mineral Resources

 

-          On 7 November 2022, the transaction for the sale of Lonmin Canada Inc., including the Denison project, to Mining Inc. (Magna) was completed, for an aggregate of US$16 million, resulting in the related attributable Mineral Resources being removed from our inventory

 

3.1.2. Battery metals

 

3.1.2.1. Lithium exploration project

 

Lithium Mineral Resources

 

 

 

31 Dec 2022

31 Dec 2021

LITHIUM

Americas

 

Tonnes

Li

LCE

H₃BO₃

H₃BO₃

Tonnes

Li

LCE

H₃BO₃

H₃BO₃

 

 

 

(Mt)

(%)

(kt)

(%)

(kt)

(Mt)

(%)

(kt)

(%)

(kt)

Exploration

Rhyolite Ridge

Measured

 2.7 

 0.2 

 24.8 

 8.3 

 225.2 

 2.8 

 0.2 

 25.4 

 8.3 

 230.7 

 

 

Indicated

 6.1 

 0.2 

 50.4 

 8.1 

 494.4 

 6.3 

 0.2 

 51.6 

 8.1 

 506.5 

 

 

Measured + Indicated

 8.8 

 0.2 

 75.2 

 8.2 

 719.6 

 9.0 

 0.2 

 77.0 

 8.2 

 737.2 

 

 

Inferred

 1.4 

 0.2 

 11.6 

 7.9 

 106.5 

 1.4 

 0.2 

 11.9 

 7.9 

 109.1 

Grand total

 

 

 10.2 

 0.2 

 86.8 

 8.1 

 826.1 

 10.4 

 0.2 

 88.9 

 8.1 

 846.3 

 6.95% attributable interest in Ioneer Ltd, manager of the Rhyolite Ridge project

LCE figures derived from in-situ Li mineralisation by applying a ratio of 1:5.323

 

The attributable Mineral Resources in the Rhyolite Ridge Lithium-Boron project (Rhyolite Ridge project), via the Group's shareholding in ioneer Ltd, were largely unchanged, and only impacted by a minor change in shareholding from 7.1% to 6.95%.

 

The Group has an agreement with ioneer Limited to establish a 50:50 joint venture with respect to the Rhyolite Ridge project in Nevada, subject to the satisfaction of all conditions precedent. During 2022, the project advanced to the final stage of permitting, with the U.S. Bureau of Land Management (BLM) publishing a Notice of Intent (NOI) in the Federal Register.

 

3.1.2.2. Copper exploration projects

 

Copper Mineral Resources

 

 

31 Dec 2022

31 Dec 2021

COPPER

Americas

Tonnes

Copper

Copper

Gold

Gold

Tonnes

Copper

Copper

Gold

Gold

Exploration

 

(Mt)

(%)

(Mlb)

(g/t)

(Moz)

(Mt)

(%)

(Mlb)

(g/t)

(Moz)

Altar¹

Measured

 637.9 

 0.4 

 6,095.0 

 0.1 

 2.4 

 637.9 

 0.4 

 6,095.0 

 0.1 

 2.4 

 

Indicated

 580.3 

 0.4 

 5,293.0 

 0.1 

 1.5 

 580.3 

 0.4 

 5,293.0 

 0.1 

 1.5 

 

Measured + Indicated

 1,218.2 

 0.4 

 11,388.0 

 0.1 

 3.9 

 1,218.2 

 0.4 

 11,388.0 

 0.1 

 3.9 

 

Inferred

 190.4 

 0.4 

 1,750.0 

 0.1 

 0.4 

 190.4 

 0.4 

 1,750.0 

 0.1 

 0.4 

Rio Grande²

Measured

  

  

  

  

  

  

  

  

  

  

 

Indicated

 12.5 

 0.3 

 82.4 

 0.4 

 0.1 

 14.1 

 0.3 

 93.2 

 0.4 

 0.2 

 

Measured + Indicated

 12.5 

 0.3 

 82.4 

 0.4 

 0.1 

 14.1 

 0.3 

 93.2 

 0.4 

 0.2 

 

Inferred

 7.2 

 0.2 

 36.7 

 0.3 

 0.1 

 8.2 

 0.2 

 41.5 

 0.3 

 0.1 

Total Measured + Indicated

 1,230.7 

 0.4 

 11,470.4 

 0.1 

 4.1 

 1,232.3 

 0.4 

 11,481.2 

 0.1 

 4.1 

Grand total

 

 1,428.3 

 0.4 

 13,257.1 

 0.1 

 4.5 

 1,430.9 

 0.4 

 13,272.7 

 0.1 

 4.6 

1100% Attributable, non-managed

217.59% Attributable, non-managed, based on shareholding in Aldebaran Resources

 

The Group's attributable total copper Mineral Resources were impacted by a minor change in shareholding in Aldebaran Resources Ltd. from 19.99% to 17.59%. As of 31 December 2022, Aldebaran has unofficially completed expenditures to gain a 60% interest in the Altar project, however official notification with audited expenditures is expected in early Q1 2023.

 

3.2. Southern Africa

3.2.1. Platinum group metals

3.2.1.1. SA PGM operations

 

-          Total 4E PGM Mineral Resources of 177.3Moz, a year-on-year increase of 1.5%

-          Total 4E PGM Mineral Reserves of 31.4Moz, a year-on-year decrease of 2.3%

 

PGM Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

PGM

Southern Africa

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Operations

Marikana¹

Measured

 73.1 

 4.2 

 9.9 

 12.2 

 73.3 

 4.2 

 9.9 

 12.3 

 

 

Indicated

 513.4 

 4.1 

 67.8 

 84.1 

 513.4 

 4.1 

 68.1 

 84.4 

 

 

Measured + Indicated

 586.5 

 4.1 

 77.7 

 96.3 

 586.6 

 4.1 

 78.0 

 96.8 

 

 

Inferred

 179.4 

 4.4 

 25.1 

 31.2 

 178.9 

 4.4 

 25.2 

 31.2 

 

Rustenburg²

Measured

 287.8 

 4.5 

 41.9 

 56.6 

 308.3 

 4.4 

 43.2 

 58.4 

 

 

Indicated

 112.7 

 5.4 

 19.4 

 25.4 

 88.6 

 5.3 

 15.1 

 20.5 

 

 

Measured + Indicated

 400.6 

 4.8 

 61.3 

 82.0 

 396.9 

 4.6 

 58.4 

 78.9 

 

 

Inferred

 14.9 

 5.6 

 2.7 

 3.5 

 11.0 

 5.6 

 2.0 

 2.7 

 

Kroondal³

Measured

 25.0 

 3.3 

 2.7 

 5.4 

 27.8 

 3.3 

 3.0 

 5.9 

 

 

Indicated

 4.7 

 3.8 

 0.6 

 1.2 

 4.8 

 3.8 

 0.6 

 1.2 

 

 

Measured + Indicated

 29.8 

 3.4 

 3.3 

 6.6 

 32.5 

 3.4 

 3.6 

 7.1 

 

 

Inferred

 2.5 

 2.9 

 0.2 

 0.5 

 2.5 

 2.9 

 0.2 

 0.5 

 

Mimosa⁴

Measured

 33.7 

 3.5 

 3.8 

 7.6 

 31.0 

 3.5 

 3.5 

 7.0 

 

 

Indicated

 13.1 

 3.5 

 1.5 

 3.0 

 17.7 

 3.5 

 2.0 

 4.0 

 

 

Measured + Indicated

 46.9 

 3.5 

 5.3 

 10.6 

 48.7 

 3.5 

 5.5 

 11.0 

 

 

Inferred

 15.5 

 3.4 

 1.7 

 3.4 

 17.2 

 3.4 

 1.9 

 3.7 

Total Measured + Indicated

 1,063.7 

 4.3 

 147.6 

 195.5 

 1,064.8 

 4.2 

 145.4 

 193.7 

Grand total

 

 

 1,276.0 

 4.3 

 177.3 

 234.0 

 1,274.4 

 4.3 

 174.7 

 231.8 

 

PGM Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

PGM

Southern Africa

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Operations

Marikana¹

Proved

 21.5 

 3.9 

 2.7 

 3.4 

 22.6 

 3.9 

 2.9 

 3.6 

 

 

Probable

 117.9 

 3.9 

 14.7 

 18.2 

 121.6 

 3.9 

 15.1 

 18.8 

 

 

Proved + Probable

 139.4 

 3.9 

 17.4 

 21.6 

 144.2 

 3.9 

 18.0 

 22.3 

 

Rustenburg²

Proved

 79.3 

 3.5 

 9.0 

 12.2 

 83.4 

 3.5 

 9.5 

 12.9 

 

 

Probable

 24.7 

 1.4 

 1.1 

 1.5 

 41.7 

 1.5 

 2.0 

 2.6 

 

 

Proved + Probable

 103.9 

 3.0 

 10.2 

 13.7 

 125.1 

 2.9 

 11.5 

 15.5 

 

Kroondal³

Proved

 8.0 

 2.6 

 0.7 

 1.3 

 10.4 

 2.6 

 0.9 

 1.7 

 

 

Probable

  

  

  

  

  

  

  

  

 

 

Proved + Probable

 8.0 

 2.6 

 0.7 

 1.3 

 10.4 

 2.6 

 0.9 

 1.7 

 

Mimosa⁴

Proved

 20.1 

 3.5 

 2.2 

 4.5 

 8.2 

 3.6 

 0.9 

 1.9 

 

 

Probable

 8.6 

 3.4 

 1.0 

 1.9 

 7.7 

 3.5 

 0.9 

 1.7 

 

 

Proved + Probable

 28.7 

 3.5 

 3.2 

 6.4 

 15.8 

 3.5 

 1.8 

 3.6 

Grand total Proved + Probable

 280.0 

 3.5 

 31.4 

 43.0 

 295.6 

 3.4 

 32.2 

 43.2 

180.64% Attributable, managed; 274% Attributable with Hoedspruit 86.35%, managed; 350% Attributable, managed; 450% Attributable, non-managed

 

Mineral Resources were positively impacted (+5.0Moz) by the re-incorporation of the Hoedspruit Mineral Resources into the Rustenburg operation, which was previously (2021) excluded subject to the final approval of the prospecting right renewal.

 

Mineral Reserves depletion (-2.7Moz) was positively off-set by the inclusion of the Mimosa North Hill project following the completion of a positive FS (+1.5 Moz), with minor LoM extensions, due to tail end optimisation at all operations, adding a further 0.5Moz.

 

Marginal decreases in LoM grades at the Rustenburg operation and Marikana operation resulted in evaluation losses of 0,4Moz, whilst increased geological complexity (faulting) at the Kroondal and Rustenburg operations impacted a further 0.3Moz. An adjustment in modifying factors (-0.3Moz) contributed further to the overall decline of 0.8Moz.

 

A detailed reconciliation of the 2021 to 2022 SA PGM operations Mineral Reserves is shown below.

 

SA PGM operations – Mineral Reserves reconciliation

Factors

4E PGM (Moz)

Mineral Reserves 2021 (attributable)

32.2

2022 Depletion

-2.7

Economic valuation

3.5

Evaluation

-0.4

Geological changes

-0.3

Technical factors

-0.3

Mineral Reserves 2022 (attributable)

31.4

 

3.2.1.2. SA PGM exploration projects

 

        Total 4E PGM Mineral Resources of 53.1Moz, an increase of 0.5%

 

PGM Mineral Resources

 

 

 

31 Dec 2022

31 Dec 2021

PGM

Southern Africa

 

Tonnes

Grade

PGM

PGM 100%

Tonnes

Grade

PGM

PGM 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Exploration

Akanani¹

Measured

  

  

  

  

  

  

  

  

 

 

Indicated

 164.5 

 4.2 

 22.0 

 27.5 

 164.5 

 4.2 

 22.0 

 27.5 

 

 

Measured + Indicated

 164.5 

 4.2 

 22.0 

 27.5 

 164.5 

 4.2 

 22.0 

 27.5 

 

 

Inferred

 87.9 

 3.4 

 9.6 

 12.0 

 87.9 

 3.4 

 9.6 

 12.0 

 

Limpopo²

Measured

 1.8 

 4.2 

 0.2 

 0.3 

 1.8 

 4.2 

 0.2 

 0.3 

 

 

Indicated

 80.0 

 4.1 

 10.5 

 17.6 

 73.6 

 4.3 

 10.3 

 17.2 

 

 

Measured + Indicated

 81.7 

 4.1 

 10.7 

 17.9 

 75.4 

 4.3 

 10.5 

 17.5 

 

 

Inferred

 70.9 

 4.0 

 9.2 

 14.2 

 67.9 

 4.2 

 9.1 

 14.0 

 

Blue Ridge³

Measured

  

  

  

  

  

  

  

  

 

 

Indicated

 9.2 

 3.2 

 1.0 

 1.9 

 9.2 

 3.2 

 1.0 

 1.9 

 

 

Measured + Indicated

 9.2 

 3.2 

 1.0 

 1.9 

 9.2 

 3.2 

 1.0 

 1.9 

 

 

Inferred

 6.7 

 3.0 

 0.6 

 1.3 

 6.7 

 3.0 

 0.6 

 1.3 

Total Measured + Indicated

 255.4 

 4.1 

 33.7 

 47.3 

 249.0 

 4.2 

 33.5 

 46.9 

Grand total

 

 

 420.9 

 3.9 

 53.1 

 74.8 

 411.4 

 4.0 

 52.9 

 74.2 

180.13% Attributable, managed, 2Attributable for Baobab and Doornvlei (80.64%), and Dwaalkop (40.32%), 350% Attributable, managed

 

The only year on year change relates to the Limpopo project area, where a positive "reasonable prospect for eventual economic extraction (RPEEE)" assessment of a wider, mechanised mining cut was completed. As a result, a revised geotechnical mining cut was accepted and this resulted in the addition of 0.3Moz.

 

The Group, through its subsidiary Akanani Mining Proprietary Limited (Akanani), held a prospecting right over the Akanani project area.  Akanani duly applied for a mining right which application has been rejected, related to an interpretation on the expiry date of the prospecting right. To secure its position, the Group has launched internal appeal proceedings in accordance with the Minerals and Petroleum Resources Development Act, 2002.  The Group has also requested the Minister of Mineral Resources and Energy to suspend the further processing of a 3rd party prospecting right application over the same area, pending the finalisation of the appeal. The internal appeal process is progressing within the prescripts of the MPRDA. The Group will resort to court action in order to enforce its rights should the internal appeal not be successful.

 

3.2.2. Gold

 

3.2.2.1 SA gold operations

-          Total gold Mineral Resources of 53.3Moz, a year-on-year decrease of 9.1%

-          Total gold Mineral Reserves of 10.3Moz, a year-on-year decrease of 1.5%

 

Gold Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

GOLD

Southern Africa

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Operations

Kloof

Measured

 32.8 

 11.4 

 12.0 

 12.0 

 34.5 

 11.3 

 12.6 

 12.6 

 

 

Indicated

 35.8 

 6.8 

 7.9 

 7.9 

 35.7 

 7.0 

 8.0 

 8.0 

 

 

Measured + Indicated

 68.6 

 9.0 

 19.9 

 19.9 

 70.2 

 9.1 

 20.6 

 20.6 

 

 

Inferred

 21.7 

 8.7 

 6.1 

 6.1 

 28.1 

 11.5 

 10.4 

 10.4 

 

Beatrix

Measured

 25.7 

 6.5 

 5.4 

 5.4 

 26.5 

 6.4 

 5.4 

 5.4 

 

 

Indicated

 25.2 

 5.3 

 4.3 

 4.3 

 25.6 

 5.2 

 4.3 

 4.3 

 

 

Measured + Indicated

 50.9 

 5.9 

 9.6 

 9.6 

 52.1 

 5.8 

 9.7 

 9.7 

 

 

Inferred

 1.6 

 4.4 

 0.2 

 0.2 

 1.7 

 4.2 

 0.2 

 0.2 

 

Driefontein

Measured

 20.7 

 11.0 

 7.3 

 7.3 

 21.1 

 10.9 

 7.4 

 7.4 

 

 

Indicated

 11.7 

 9.0 

 3.4 

 3.4 

 12.2 

 8.5 

 3.3 

 3.3 

 

 

Measured + Indicated

 32.4 

 10.2 

 10.7 

 10.7 

 33.3 

 10.0 

 10.7 

 10.7 

 

 

Inferred

 1.3 

 4.8 

 0.2 

 0.2 

 0.8 

 6.6 

 0.2 

 0.2 

 

Cooke¹

Measured

 159.6 

 0.3 

 1.3 

 1.7 

 159.6 

 0.3 

 1.3 

 1.7 

 

 

Indicated

 43.3 

 0.3 

 0.4 

 0.6 

 45.6 

 0.3 

 0.5 

 0.6 

 

 

Measured + Indicated

 202.9 

 0.3 

 1.7 

 2.3 

 205.2 

 0.3 

 1.8 

 2.3 

 

 

Inferred

  

  

  

  

  

  

  

  

 

DRDGOLD²

Measured

 244.8 

 0.3 

 2.5 

 5.0 

 255.0 

 0.3 

 2.6 

 5.2 

 

 

Indicated

 285.8 

 0.2 

 2.3 

 4.5 

 290.1 

 0.2 

 2.3 

 4.6 

 

 

Measured + Indicated

 530.5 

 0.3 

 4.8 

 9.5 

 545.1 

 0.3 

 4.9 

 9.8 

 

 

Inferred

 10.7 

 0.2 

 0.1 

 0.2 

 10.8 

 0.2 

 0.1 

 0.2 

Total Measured + Indicated

 885.3 

 1.6 

 46.7 

 51.9 

 905.9 

 1.6 

 47.7 

 53.1 

Grand total

 

 

 920.7 

 1.8 

 53.3 

 58.6 

 947.2 

 1.9 

 58.6 

 64.1 

176% Attributable, managed, 250.33% Attributable, non-managed

 

Gold Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

GOLD

Southern Africa

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Operations

Kloof

Proved

 11.0 

 6.1 

 2.1 

 2.1 

 12.7 

 6.2 

 2.5 

 2.5 

 

 

Probable

 7.5 

 5.4 

 1.3 

 1.3 

 7.7 

 4.9 

 1.2 

 1.2 

 

 

Proved + Probable

 18.6 

 5.8 

 3.4 

 3.4 

 20.3 

 5.7 

 3.8 

 3.8 

 

Beatrix

Proved

 5.9 

 3.8 

 0.7 

 0.7 

 6.8 

 3.9 

 0.8 

 0.8 

 

 

Probable

 0.7 

 3.1 

 0.1 

 0.1 

 0.9 

 2.7 

 0.1 

 0.1 

 

 

Proved + Probable

 6.7 

 3.7 

 0.8 

 0.8 

 7.7 

 3.7 

 0.9 

 0.9 

 

Driefontein

Proved

 5.8 

 8.4 

 1.6 

 1.6 

 7.7 

 8.4 

 2.1 

 2.1 

 

 

Probable

 5.6 

 7.9 

 1.4 

 1.4 

 4.2 

 7.2 

 1.0 

 1.0 

 

 

Proved + Probable

 11.4 

 8.1 

 3.0 

 3.0 

 11.9 

 8.0 

 3.0 

 3.0 

 

Cooke¹

Proved

  

  

  

  

  

  

  

  

 

 

Probable

 7.3 

 0.3 

 0.1 

 0.1 

 9.5 

 0.3 

 0.1 

 0.1 

 

 

Proved + Probable

 7.3 

 0.3 

 0.1 

 0.1 

 9.5 

 0.3 

 0.1 

 0.1 

 

DRDGOLD²

Proved

 205.0 

 0.3 

 2.2 

 4.3 

 122.5 

 0.3 

 1.3 

 2.6 

 

 

Probable

 103.5 

 0.2 

 0.8 

 1.6 

 132.5 

 0.3 

 1.3 

 2.6 

 

 

Proved + Probable

 308.5 

 0.3 

 3.0 

 5.9 

 255.0 

 0.3 

 2.6 

 5.2 

Grand total Proved + Probable

 352.4 

 0.9 

 10.3 

 13.2 

 304.4 

 1.1 

 10.4 

 13.0 

176% Attributable, managed, 250.33% Attributable, non-managed

 

The change in Mineral Resources can be attributed to the Kloof operations where a re-interpretation of the Ventersdorp Contact Reef (VCR) geological facies resulted in a reduction of 5.7Moz, predominantly in the Inferred category, situated below the shafts infrastructure.

 

Mineral Reserves depletion (-0.8Moz), were positively off-set by extension of the Beatrix LoM by 1 year, and minor increases at Driefontein and Kloof (+0.3Moz), while our attributable interest in DRDGOLD contributed a further 0.7Moz.  Notable other changes relate to the closure of Beatrix 4# and the curtailment of operations on 47 level at Kloof 4# (-0.4Moz).

 

A detailed reconciliation of the 2021 to 2022 SA gold operations' Mineral Reserves is provided in the table.

 

SA gold operations – Mineral Reserves reconciliation

 

Factors

Au (Moz)

31 Dec 2021

10.5

Depletion

-0.8

Post depletion

9.7

Area inclusions/exclusions

0.3

Attributable adjustment

0.7

Geological interpretation

0.05

Economic parameters

-0.4

Modifying factors

-0.04

31 Dec 2022

10.3

 

3.2.2.2. SA gold development project

 

-          Total gold Mineral Resources of 9.1Moz, unchanged

-          Total gold Mineral Reserves of 2.7Moz, a year-on-year increase of 2.8%

 

Gold Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

GOLD

Southern Africa

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Development

Burnstone

Measured

 1.1 

 6.2 

 0.2 

 0.2 

 1.1 

 6.2 

 0.2 

 0.2 

 

 

Indicated

 25.5 

 5.6 

 4.6 

 4.6 

 25.5 

 5.6 

 4.6 

 4.6 

 

 

Measured + Indicated

 26.6 

 5.7 

 4.8 

 4.8 

 26.6 

 5.7 

 4.8 

 4.8 

 

 

Inferred

 31.5 

 4.2 

 4.3 

 4.3 

 31.5 

 4.2 

 4.3 

 4.3 

Grand total

 

 

 58.1 

 4.9 

 9.1 

 9.1 

 58.1 

 4.9 

 9.1 

 9.1 

 

Gold Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

GOLD

Southern Africa

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Development

Burnstone

Proved

  

  

  

  

  

  

  

  

 

 

Probable

 20.5 

 4.0 

 2.7 

 2.7 

 20.6 

 3.9 

 2.6 

 2.6 

Grand total Proved + Probable

 20.5 

 4.0 

 2.7 

 2.7 

 20.6 

 3.9 

 2.6 

 2.6 

 

At the Burnstone development project the increase in Mineral Reserves was driven by an optimisation of the tail end production profile. A detailed reconciliation of the 2021 to 2022 SA gold operations' Mineral Reserves is provided in the following table.

 

SA gold development – Mineral Reserves reconciliation

Factors

Au (Moz)

31 Dec 2021

2.6

Post depletion

2.6

Area inclusions/exclusions

0.1

31 Dec 2022

2.7

 

3.2.2.3. SA gold exploration projects

 

-          Total gold Mineral Resources of 6.9Moz, remained unchanged

 

Gold Mineral Resources

 

 

 

31 Dec 2022

31 Dec 2021

GOLD

Southern Africa

 

Tonnes

Grade

Gold

Gold 100%

Tonnes

Grade

Gold

Gold 100%

 

 

 

(Mt)

(g/t)

(Moz)

(Moz)

(Mt)

(g/t)

(Moz)

(Moz)

Exploration

SOFS

Measured

  

  

  

  

  

  

  

  

 

 

Indicated

 44.1 

 4.5 

 6.4 

 6.4 

 44.1 

 4.5 

 6.4 

 6.4 

 

 

Measured + Indicated

 44.1 

 4.5 

 6.4 

 6.4 

 44.1 

 4.5 

 6.4 

 6.4 

 

 

Inferred

 4.0 

 3.6 

 0.5 

 0.5 

 4.0 

 3.6 

 0.5 

 0.5 

Grand total

 

 

 48.1 

 4.4 

 6.9 

 6.9 

 48.1 

 4.4 

 6.9 

 6.9 

 

3.2.3. Uranium exploration projects

 

-          Total U3O8  Mineral Resources of 66.6Mlb, unchanged

 

Uranium Mineral Resources

 

 

 

31 Dec 2022

31 Dec 2021

URANIUM

Southern Africa

 

Tonnes

Grade

U₃O₈

U₃O₈ 100%

Tonnes

Grade

U₃O₈

U₃O₈ 100%

 

 

 

(Mt)

 (kg/t)

 (Mlb)

 (Mlb)

(Mt)

 (kg/t)

 (Mlb)

 (Mlb)

Exploration

Beatrix

Measured

 3.6 

 1.1 

 8.5 

 8.5 

 3.6 

 1.1 

 8.5 

 8.5 

 

 

Indicated

 7.8 

 1.1 

 18.3 

 18.3 

 7.8 

 1.1 

 18.3 

 18.3 

 

 

Measured + Indicated

 11.4 

 1.1 

 26.9 

 26.9 

 11.4 

 1.1 

 26.9 

 26.9 

 

 

Inferred

  

 1.1 

 0.1 

 0.1 

  

 1.1 

 0.1 

 0.1 

 

Cooke¹

Measured

 154.4 

 0.1 

 31.9 

 42.0 

 156.0 

 0.1 

 31.9 

 42.0 

 

 

Indicated

 41.3 

 0.1 

 7.8 

 10.2 

 39.7 

 0.1 

 7.6 

 9.9 

 

 

Measured + Indicated

 195.7 

 0.1 

 39.6 

 52.2 

 195.7 

 0.1 

 39.5 

 52.0 

 

 

Inferred

  

  

  

  

  

  

  

  

Total Measured + Indicated

 207.0 

 0.1 

 66.5 

 79.0 

 207.0 

 0.1 

 66.4 

 78.8 

Grand total

 

 

 207.1 

 0.1 

 66.6 

 79.1 

 207.1 

 0.1 

 66.5 

 78.9 

176% Attributable, managed

 

Uranium Mineral Resources occur as co-mineralisation within tonnage reported under the SA gold Mineral Resources. Minor variations occurred due to changes in the gold production schedules for the Cooke operations.

 

3.3. Europe

3.3.1. Battery metals

3.3.1.1. Keliber lithium development project

 

-          LCE Mineral Resources of 366.1kt, a year-on-year increase of 248%

-          Maiden LCE Mineral Reserves of 193.6kt

 

Lithium Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

LITHIUM

Europe

 

Tonnes

Li

LCE

LCE 100%

Tonnes

Li

LCE

LCE 100%

 

 

 

(Mt)

(%)

(kt)

(kt)

(Mt)

(%)

(kt)

(kt)

Development

Keliber

Measured

 3.7 

 0.5 

 106.4 

 125.3 

 1.1 

 0.5 

 33.3 

 125.3 

 

 

Indicated

 8.0 

 0.5 

 202.4 

 238.3 

 2.4 

 0.5 

 62.0 

 232.9 

 

 

Measured + Indicated

 11.6 

 0.5 

 308.9 

 363.5 

 3.6 

 0.5 

 95.3 

 358.2 

 

 

Inferred

 2.8 

 0.4 

 57.2 

 67.4 

 0.4 

 0.4 

 9.8 

 36.9 

Grand total

 

 

 14.5 

 0.5 

 366.1 

 430.9 

 4.0 

 0.5 

 105.1 

 395.1 

 

Lithium Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

LITHIUM

Europe

 

Tonnes

Li

LCE

LCE 100%

Tonnes

Li

LCE

LCE 100%

 

 

 

(Mt)

(%)

(kt)

(kt)

(Mt)

(%)

(kt)

(kt)

Development

Keliber¹

Proved

 3.3 

 0.5 

 85.4 

 100.5 

 

 

Probable

 4.9 

 0.4 

 108.2 

 127.3 

Grand total Proved + Probable

 8.2 

 0.4 

 193.6 

 227.9 

84.96% Attributable, non-managed

During 2022, Sibanye-Stillwater increased its shareholding in Keliber (2021: 26.6%) to a controlling 84.96%, enabling Sibanye-Stillwater to act decisively and fast-track the Keliber project. A FS completed by Keliber in February 2022 and updated in October 2022, confirmed the project economics, and on 28 November 2022 the Board approved development of the Keliber lithium project in Finland, beginning with the construction of the lithium-hydroxide refinery. The reported Mineral Reserves reflect the open pit portion of the project only.

 

Ongoing exploration activities have also added 30.4kt of LCE to the Mineral Resource Inventory. The increased Mineral Resources are related to the maiden resource estimates of the Tuoreetsaaret and Leviakangas deposits.

 

3.4. Australia

3.4.1. Zinc tailings retreatment (part of the circular economy)

3.4.1.1. New Century zinc operation

-          Zinc Mineral Resources of 798.5Mlb, a year-on-year decrease of 21.4%

-          Zinc Mineral Reserves of 445.5Mlb, a year-on-year decrease of 31.4%

 

Zinc Mineral Resources Inclusive of Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

ZINC

Australia

 

Tonnes

Zinc

Zinc

Zinc 100%

Tonnes

Zinc

Zinc

Zinc 100%

 

 

 

(Mt)

(%)

(Mlb)

(Mlb)

(Mt)

(%)

(Mlb)

(Mlb)

Operations

New Century

Measured

 7.3 

 3.1 

 490.7 

 2,467.0 

 10.6 

 3.0 

 706.9 

 3,536.2 

 

 

Indicated

  

  

  

  

  

  

  

  

 

 

Measured + Indicated

 7.3 

 3.1 

 490.7 

 2,467.0 

 10.6 

 3.0 

 706.9 

 3,536.2 

 

 

Inferred

  

  

  

  

  

  

  

  

Grand total

 

 

 7.3 

 3.1 

 490.7 

 2,467.0 

 10.6 

 3.0 

 706.9 

 3,536.2 

 

ZINC

Australia

 

Tonnes

Zinc

Zinc

Lead

Lead

Tonnes

Zinc

Zinc

Lead

Lead

 

 

 

(Mt)

(%)

(Mlb)

(%)

(Mlb)

(Mt)

(%)

(Mlb)

(%)

(Mlb)

Exploration

New Century

Measured

 0.2 

 4.8 

 21.0 

 5.4 

 23.7 

 0.2 

 4.8 

 21.2 

 5.4 

 23.8 

 

 

Indicated

 1.8 

 5.7 

 221.0 

 2.4 

 92.5 

 1.8 

 5.7 

 222.1 

 2.4 

 93.0 

 

 

Measured + Indicated

 2.0 

 5.6 

 242.1 

 2.7 

 116.2 

 2.0 

 5.6 

 243.3 

 2.7 

 116.8 

 

 

Inferred

 0.5 

 6.5 

 65.8 

 3.1 

 31.6 

 0.5 

 6.5 

 66.1 

 3.1 

 31.7 

Grand total

 

 

 2.4 

 5.8 

 307.8 

 2.8 

 147.8 

 2.4 

 5.8 

 309.4 

 2.8 

 148.5 

 

Zinc Mineral Reserves

 

 

 

31 Dec 2022

31 Dec 2021

ZINC

Australia

 

Tonnes

Zinc

Zinc

Zinc 100%

Tonnes

Zinc

Zinc

Zinc 100%

 

 

 

(Mt)

(%)

(Mlb)

(Mlb)

(Mt)

(%)

(Mlb)

(Mlb)

Operations

New Century

Proved

 6.8 

 3.0 

 445.5 

 2,239.9 

 9.9 

 3.0 

 649.2 

 3,247.4 

 

 

Probable

  

  

  

  

  

  

  

  

Grand total Proved + Probable

 6.8 

 3.0 

 445.5 

 2,239.9 

 9.9 

 3.0 

 649.2 

 3,247.4 

19.89% Attributable, non-managed

 

The year on year change in Mineral Resources and Mineral Reserves were driven by depletion.

 

Corporate governance

 

This Mineral Reserve and Mineral Resource declaration represents a condensed and consolidated summary of the full Sibanye-Stillwater Mineral Resource and Mineral Reserve declaration available in the Group Mineral Resource and Mineral Reserve Report, which will be published on 24 April 2023 and will be available at www.sibanyestillwater.com/news-investors/reports/annual/.

 

The Mineral Resources and Mineral Reserves are estimates at a particular date, and are affected by fluctuations in mineral prices, the exchange rates, operating costs, mining permits, changes in legislation and operating factors.

 

Sibanye-Stillwater prepares and reports its Mineral Resources and Mineral Reserves in accordance with the SAMREC Code, the updated Section 12 of the JSE Listings Requirements; and the SEC regulation S-K Sub-part 1300. For non-managed mineral properties, Mineral Resources and Mineral Reserves are in certain cases prepared under different codes, such as JORC and NI-43-101. These codes are closely aligned with SAMREC, form part of CRIRSCO (Committee for Mineral Reserves International Reporting Standards), and the estimates are therefore deemed to be consistent with SAMREC and SK1300.

 

Production volumes are reported in metric tonnes (t). By-product metals that do not constitute material contribution to potential revenue-flows are typically excluded from the estimates.

 

All financial models used to determine the managed Mineral Reserves are based on current tax regulations as at 31 December 2022. Rounding of figures may result in minor computational discrepancies. Where this happens, it is not deemed significant.

There are teams QP's, designated in terms of the respective national reporting codes, who take responsibility for the reporting of Mineral Resources and Mineral Reserves at the respective operations and projects. Corporate governance on the overall compliance of the Group’s figures and responsibility for the generation of a Group consolidated statement has been overseen by the Group's lead Competent Persons, included below. The Group has the written confirmation of the lead Competent Persons that the information, as disclosed in this report, is compliant with the relevant security exchanges’ listing requirements (Section 12 of the JSE listing requirements, SAMREC Table 1 and the US SEC SK1300), and that it may be published in the form and context in which it was intended.

 

For the managed operations, Stephan Stander is the Group Lead QP for Mineral Resources; and Tom Van Den Berg is the Group Lead QP for Mineral Reserves. Stephan is a registered member of the South African Council for Natural Scientific Professions (SACNASP 400089/96). Tom is a registered member of the South African Institute of Mining and Metallurgy (SAIMM 700497).

 

Investor relations contact:

Email: ir@sibanyestillwater.com

James Wellsted

EVP:  Investor Relations and Corporate Affairs

Tel: +27 (0) 83 453 4014

www.sibanyestillwater.com 

 

Sponsor: J.P. Morgan Equities South Africa Proprietary Limited

 

In Europe:

Swiss Resource Capital AG

Jochen Staiger

info@resource-capital.ch

www.resource-capital.ch

 

Ends.

 

 

5. Forward looking statements

 

The information in this document may contain forward-looking statements within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements, including, among others, those relating to Sibanye Stillwater Limited’s (“Sibanye-Stillwater” or the “Group”) financial positions, business strategies, plans and objectives of management for future operations, are necessarily estimates reflecting the best judgment of the senior management and directors of Sibanye-Stillwater and involve a number of risks and uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a consequence, these forward-looking statements should be considered in light of various important factors, including those set forth in this document.

 

All statements other than statements of historical facts included in this document may be forward-looking statements. Forward-looking statements also often use words such as “will”, “would”, “expect”, “forecast”, “potential”, “may”, “could”, “believe”, “aim”, “anticipate”, “target”, “estimate” and words of similar meaning. By their nature, forward-looking statements involve risk and uncertainty because they relate to future events and circumstances and should be considered in light of various important factors, including those set forth in this disclaimer. Readers are cautioned not to place undue reliance on such statements.

 

The important factors that could cause Sibanye-Stillwater’s actual results, performance or achievements to differ materially from estimates or projections contained in the forward-looking statements include, without limitation, Sibanye-Stillwater’s future financial position, plans, strategies, objectives, capital expenditures, projected costs and anticipated cost savings, financing plans, debt position and ability to reduce debt leverage; economic, business, political and social conditions in South Africa, Zimbabwe, the United States and elsewhere; plans and objectives of management for future operations; Sibanye-Stillwater’s ability to obtain the benefits of any streaming arrangements or pipeline financing; the ability of Sibanye-Stillwater to comply with loan and other covenants and restrictions and difficulties in obtaining additional financing or refinancing; Sibanye-Stillwater’s ability to service its bond instruments; changes in assumptions underlying Sibanye-Stillwater’s estimation of its current mineral reserves; any failure of a tailings storage facility; the ability to achieve anticipated efficiencies and other cost savings in connection with, and the ability to successfully integrate, past, ongoing and future acquisitions, as well as at existing operations; the ability of Sibanye-Stillwater to complete any ongoing or future acquisitions; the success of Sibanye-Stillwater’s business strategy and exploration and development activities, including any proposed, anticipated or planned expansions into the battery metals or adjacent sectors and estimations or expectations of enterprise value (including the Rhyolite Ridge project); the ability of Sibanye-Stillwater to comply with requirements that it operate in ways that provide progressive benefits to affected communities; changes in the market price of gold, PGMs, battery metals (e.g., nickel, lithium, copper and zinc) and the cost of power, petroleum fuels, and oil, among other commodities and supply requirements; the occurrence of hazards associated with underground and surface mining; any further downgrade of South Africa’s credit rating; a challenge regarding the title to any of Sibanye-Stillwater’s properties by claimants to land under restitution and other legislation; Sibanye-Stillwater’s ability to implement its strategy and any changes thereto; the outcome of legal challenges to the Group’s mining or other land use rights; the occurrence of labour disputes, disruptions and industrial actions; the availability, terms and deployment of capital or credit; changes in the imposition of industry standards, regulatory costs and relevant government regulations, particularly environmental, sustainability, tax, health and safety regulations and new legislation affecting water, mining, mineral rights and business ownership, including any interpretation thereof which may be subject to dispute; the outcome and consequence of any potential or pending litigation or regulatory proceedings, including in relation to any environmental, health or safety issues; failure to meet ethical standards, including actual or alleged instances of fraud, bribery or corruption; the effect of climate change or other extreme weather events on Sibanye-Stillwater’s business; the concentration of all final refining activity and a large portion of Sibanye-Stillwater’s PGM sales from mine production in the United States with one entity; the identification of a material weakness in disclosure and internal controls over financial reporting; the effect of US tax reform legislation on Sibanye-Stillwater and its subsidiaries; the effect of South African Exchange Control Regulations on Sibanye-Stillwater’s financial flexibility; operating in new geographies and regulatory environments where Sibanye-Stillwater has no previous experience; power disruptions, constraints and cost increases; supply chain disruptions and shortages and increases in the price of production inputs; the regional concentration of Sibanye-Stillwater’s operations; fluctuations in exchange rates, currency devaluations, inflation and other macro-economic monetary policies; the occurrence of temporary stoppages or precautionary suspension of operations at its mines for safety or environmental incidents (including natural disasters) and unplanned maintenance; Sibanye-Stillwater’s ability to hire and retain senior management and employees with sufficient technical and/or production skills across its global operations necessary to meet its labour recruitment and retention goals, as well as its ability to achieve sufficient representation of historically disadvantaged South Africans in its management positions; failure of Sibanye-Stillwater’s information technology, communications and systems; the adequacy of Sibanye-Stillwater’s insurance coverage; social unrest, sickness or natural or man-made disaster at informal settlements in the vicinity of some of Sibanye-Stillwater’s South African-based operations; and the impact of HIV, tuberculosis and the spread of other contagious diseases, such as the coronavirus disease (COVID-19). Further details of potential risks and uncertainties affecting Sibanye-Stillwater are described in Sibanye-Stillwater’s filings with the Johannesburg Stock Exchange and the United States Securities and Exchange Commission, including the 2021 Integrated Report and the annual report on Form 20-F for the fiscal year ended 31 December 2021 (SEC File no. 333-234096). These forward-looking statements speak only as of the date of the content. Sibanye-Stillwater expressly disclaims any obligation or undertaking to update or revise any forward-looking statement (except to the extent legally required). These forward-looking statements have not been reviewed or reported on by the Group’s external auditors.

 

NON-IFRS MEASURES

The information in this document contains certain non-IFRS measures, including adjusted EBITDA, AISC and AIC. These measures may not be comparable to similarly-titled measures used by other companies and are not measures of Sibanye-Stillwater’s financial performance under IFRS. These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Sibanye- Stillwater is not providing a reconciliation of the forecast non-IFRS financial information presented in this report because it is unable to provide this reconciliation without unreasonable effort.

 

WEBSITES

 

References in this document to information on websites (and/or social media sites) are included as an aid to their location and such information is not incorporated in, and does not form part of, this report.

 

Sibanye Stillwater Limited

Incorporated in the Republic of South Africa

Registration number 2014/243852/06

Share codes: SSW (JSE) and SBSW (NYSE)

ISIN – ZAE000259701

Issuer code: SSW

(“Sibanye-Stillwater”,”the Company” and/or “the Group”)

 

Registered Address:

Constantia Office Park

Bridgeview House • Building 11 • Ground Floor

Cnr 14th Avenue & Hendrik Potgieter Road

Weltevreden Park • 1709

 

Postal Address:

Private Bag X5 • Westonaria • 1780

 

Tel +27 11 278 9600 • Fax +27 11 278 9863

 

Website: www.sibanyestillwater.com