Menu
Microsoft strongly encourages users to switch to a different browser than Internet Explorer as it no longer meets modern web and security standards. Therefore we cannot guarantee that our site fully works in Internet Explorer. You can use Chrome or Firefox instead.

Bam Bam Drill Results Completion Update for Majuba Hill Project in Nevada


 

VANCOUVER, BC January 24, 2022 — Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) would like to provide an update for the ongoing analysis of the samples from the 2021 core and reverse-circulation (“RC”) drill program at the Majuba Hill Project in Pershing County Nevada.

 

Bam Bam drilled 4,539.5 meters (14,893.5 feet) in sixteen holes. The drill program was designed to complete in-fill, stepout, and new exploration holes for three areas.

 

-          Majuba Known Copper Oxide (In-fill and Stepout)

-          DeSoto Copper Oxide Target (Stepout)

-          Copper-Gold Target (New Exploration)

 


 

A total of 3,167 samples were submitted to the ALS USA Inc. sample Prep Facilities in Reno and Elko, Nevada. Bam Bam has an active tracking program and the sample status information provided by ALS indicates all assays should be complete by early February. Assay results will be reported as soon as the results are integrated into the database and the QA/QC analyses are complete.

 

David Greenway, President and CEO, commented: I am very pleased with the progress made on the Majuba Hill District in 2021 and we eagerly await the results from the latest round of drilling. We know that the high grade is present at Majuba, as seen with previous intersects like 43 ft of 4% Cu with MBH-2.

 

With the visual reports made on the newly discovered diorite, we expect the core assays to show us the importance of what we have discovered. This will help us to plan for to expanding the mineralization in this significant Copper-Gold Porphyry deposit.

 

Hole

Target

Type

Azimuth

Angle

Length (m)

Length (ft)

MHB-10

Known Oxide

RC

0

-90

257.6

845

MHB-11

Known Oxide

RC

0

-70

152.4

500

MHB-12

Known Oxide

RC

0

-45

213.4

700

MHB-13

Known Oxide

RC

0

-90

208.8

685

MHB-14

Known Oxide

RC

0

-90

356.6

1170

MHB-15

Known Oxide

RC

0

-90

304.8

1000

MHB-16

Known Oxide

RC

0

-90

196.3

644

MHB-17

Known Oxide

RC

0

-90

243.8

800

MHB-18

Known Oxide

RC

0

-90

243.8

800

MHB-19

Known Oxide

RC

110

-45

54.9

180

MHB-20

Copper-Gold

Core

10

-70

310.0

1017

MHB-21

Known Oxide

RC

252

-80

454.2

1490

MHB-22

Copper-Gold

Core

140

-60

549.4

1802.5

MHB-23

Known Oxide

RC

0

-90

304.8

1000

MHB-24

Known Oxide

RC

90

-45

243.8

800

MHB-25

DeSoto

RC

0

-90

140.2

460

MHB-26

DeSoto

RC

0

-90

304.8

1000

 

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

 

The Company has implemented a QA/QC program using best industry practices at the Majuba Hill Project. The samples are transported from the BBR secure warehouse or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS then transports the prepared pulps to their analytical lab in Reno, Nevada or Vancouver, B.C. Soil and rock chip samples are transported by the company directly to Elko or Reno, Nevada.

 

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES assay. Approximately 5% of the submitted samples are drill duplicates and copper-gold-porphyry commercial standard reference material pulps.

 

Qualified Person

 

The scientific and technical information contained in this news release has been reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who is a "Qualified Person" as such term is defined under National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

 

About Bam Bam Resources Corp.

 

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the identification, review and acquisition of latter stage copper and copper/silver/gold assets. This is in direct response to the growing worldwide demand and lack of supply for precious metals fueled by the Green New Deal in the US and most other developed nations with similar programs aimed at addressing climate change. Such programs are heavily reliant on silver, gold and especially copper to produce Electric Vehicles and other renewable power sources, as well as building infrastructure to provide clean and affordable electricity.

 

The flagship project is the Majuba Hill copper, silver and gold District located 156 miles outside Reno, Nevada, USA. Management has been mandated to focus on safe, mining friendly jurisdictions where government regulations are supportive of mining operations.

 

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

On Behalf of the Board of Bam Bam Resources Corp.

 

“David Greenway”

David C. Greenway

President & CEO

 

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

 

Forward-Looking Statements

 

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

 

Like: 0
Share

Comments